Bahri Bonded Zone – Container Stock Yard (Phase 1) & Warehouse (Phase 2)

Client: Saudi Amana Contracting Co. LLC
Location: Jeddah Islamic Port, Saudi Arabia
Project Type: Maritime Logistics and Container Storage Facility

Comprehensive Scope of Work:

  • Massive Cable Infrastructure: Execution of over 130,000 meters of cable pulling across the entire facility
  • Heavy-Duty Power Distribution: Installation of 1C × 630mm² single-core cables for main power distribution systems
  • Armored Power Systems: Installation of 4C × 300mm² armored power cables for harsh industrial environments
  • Grounding Systems: Complete installation of 1C × 4mm² grounding lines for comprehensive electrical safety
  • Equipment Integration: Professional termination of 90+ panels and major equipment including:
    • Power transformers for voltage conversion
    • Main Distribution Boards (MDBs) for power distribution
    • Capacitor banks for power factor correction
    • Emergency generators for backup power
    • Various Distribution Boards (DBs) throughout the facility
  • Quality Assurance: All installations completed with calibrated testing equipment ensuring optimal performance
  • Professional Standards: Complete cable tagging system for maintenance and identification
  • Safety Compliance: Full compliance with HSE (Health, Safety, and Environmental) standards and project specifications